Hamilton · Applicationswritten

Application for Occupancy Permit — Single Family, Semi-Detached, Townhouse (Row House), Additional Dwelling Unit (ADU)

Published by City of Hamilton under Building Permit

Submit to
building@hamilton.ca
Applies to
any
Work types
new construction · addition
Signatories
owner · builder · authorized agent

The City of Hamilton Building Division's occupancy permit application for a new single family, semi-detached or townhouse dwelling and for internal or detached additional dwelling units, the low-rise counterpart to the city's multi-unit residential, industrial, commercial and institutional version, with a separate form for each unit. Box A and Box B list water meter, sanitary sewer dye test certificate, radon rough-in and final as-built survey items; Box C runs through structure and envelope, fire ratings, smoke alarms, garage gas proofing, grading as per OBC 9.14 and septic system.

What it covers

  • Application type
  • Address
  • OBC requirements – confirm these requirements are completed by checking the box
  • Owner/Builder/Authorized Agent Information (must be completed in full)
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Hamilton
Category
Applications · new house
Published under
Building Permit — the municipality's own heading
Alias
Single Family, Semi-Detached, Townhouse (Row House), Additional Dwelling Unit (ADU)
Window
A minimum of three (3) business days for confirmation, and a minimum of two (2) business days to process and issue the permit
Form ref
Ontario Building Code – Division C – Subsection 1.3.3
Instruments
Ontario Building Code – Division C – Subsection 1.3.3 · Building By-law 15-058 · Building Code Act, 1992
Required for
An occupancy permit for a new house, townhouse or additional dwelling unit
Document date
March 5, 2025
Building types
residential
Publisher note
Issued by the City of Hamilton's Planning and Economic Development Department, Building Division.
Tags
applicationoccupancyresidentialadditional-residential-unitseplan
Application for Occupancy Permit — Single Family, Semi-Detached, Townhouse (Row House), Additional Dwelling Unit (ADU)Open at hamilton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.